Skip to Content

Manufacturing

+ MES + Maintenance  + PLM  + Quality


Start Now 

Manufacturing Reinvented

A modern solution to an old problem.

No more time clocking

Accurate planning directly based on real manufacturing times measures.

All-in-one

MRP, Quality, Maintenance and PLM fully integrated.

Realtime Communication

Display worksheets, quality alerts to workers during operations.

Shop floor automation

Capture data in real-time from your equipment using the API.

The MRP software Toyota loves.

All you need in a single software

Easy + Powerful = Valuable

Engineering

  • PLM
  • Bill of Materials
  • Versioning

Manufacturing Engineering

  • Routings
  • Worksheets

Manufacturing

  • Planning
  • Control Panel
  • Work orders


Supply Chain

  • MPS
  • Routes
  • Procurement Rules

Quality

  • Control Points
  • Checks (SPC)
  • Alerts

Maintenance

  • Equipment Management
  • Maintenance Requests

Workcenter Control Panel

 rack Time
 Display Worksheets
 Register Production
 Integrate Quality checks
 In Process Alerts
 Record Serial/lot number

Optimize your inventory level

Through accurate fulfillment propositions.


Use make-to-order rules, minimum stock rules or the master production schedule to automate procurements. Let the scheduler compute everything for you. Use routes, constraints and lead time to optimize inventory level and avoid shortages.

Barcodes,
out-of-the-box

Whether you use lots, serial numbers or unidentified products, you can use barcodes to speed up operations at every step:

  • Reception control
  • Picking
  • Packing 
  • Work orders
  • ...and more!
 
 

Great Reporting & KPIs

All the data you need at your fingertips.


Control your productivity with real-time Overall Equipment Efficiency (OEE) reports and monitor the 6 big losses of TPM. Track maintenance KPIs like MTTR and MTBF. Create customized dashboards to monitor performance in real time.

Dynamic reports on everything from costing to traceability, performance analysis, OEE, and more help you make smarter decisions about your business.

Fully integrated with other Odoo Apps